2019棋牌平台

contact us Hello, welcome to the official website of Shandong Wanxing Environmental Technology Group Co., Ltd.!

contact details

CONTACT

Shandong Wanxing Environmental Technology Group Co., Ltd.

Sales Service Department:

Manager Wang: 13210682555

Sales one: 0536-4857999

Sales Department 2: 0536-6256789

After-sales service department:

Manager Wang: 15863643333

Technical Service Department:

Manager Liu: 15963636555

Service supervision hotline:

Manager Shen: 13465665999

Fax: 0536-6685555

Postcode: 262100

E-MAIL: sdwxhb999@163.com

Alibaba official website

wanxinghuanbao.1688.com

Address: West side of the south of Wenshui South Road, Xin'an Street, Anqiu City, Shandong Province

公司新闻 Position: Home > News > Company News > Company News

How to properly install domestic sewage treatment equipment?

Author: yuedongzs.cn

å ° åŒºç ”Ÿæ´» æ ± ¡æ ° ´å¤ „ç † è®¾å¤ ‡
Domestic sewage treatment equipment is machinery and equipment used to solve daily wastewater. The small and medium-sized domestic sewage treatment software biogas digester uses the technology of anaerobic fermentation at room temperature and follows the basic principle of "multi-purpose self-flow and gradually dissolve" to create a new class Ⅰ anaerobic fermentation-class Ⅱ facultative digestion and absorption. It consists of processing technologies such as anaerobic fermentation, facultative digestion and absorption, wastewater backflow and filling materials.
1. The centrifugal water pump is strictly forbidden to solve all positions during operation to avoid safety accidents caused by leakage of working pressure.
2. During the trial operation of pumps and blowers, reliable protective covers must be provided in the rotating positions such as universal couplings.
3. After the trial operation, the switching power supply should be disconnected to avoid starting the car under the standards not allowed by the system software.
4. MBR sewage treatment installation equipment, after the trial operation, before the project acceptance and transfer to the care of specific professional staff to prevent the loss or damage of parts; professional drivers or staff who have developed a knowledge of the characteristics of the centrifugal pump to start the pump.
5. The construction team entering the site must go through countermeasures, and wear qualified maintenance tools, safety helmets, etc.
6. When installing domestic sewage treatment equipment, during the whole process of equipment hoisting, the commander should be elevated to prevent the machinery and equipment from colliding. Special machinery management methods, storage and storage for key machines and equipment.
7. For electrical equipment, be sure to prevent moisture, cold and humidity.
8. When lifting the machine and equipment with a rotating shaft, the rotating shaft cannot be used as a lifting point, and the anti-rolling bearing is deformed.
9. When the equipment is hoisted, the galvanized steel wire rope cannot be tied to the machine equipment immediately. A cork board must be placed between the galvanized steel wire rope and the machine equipment to maintain the surface of the machine equipment not damaged.
10. Fire safety tools are available at the construction site with a total number and quality. Otherwise, fire safety is urgently needed, and everyone is prohibited from moving for other purposes.
11. Centralized addresses of high and low voltage power distribution rooms and electrical equipment must be placed with non-conductive fire extinguishers such as carbon tetrachloride and powder.
12. Welders must strictly abide by various safety operation regulations and application regulations of automatic welding machines and small tools.
13. During the operation, be sure to check whether the small tools, machinery and equipment are intact and whether the safety device is reasonable.
14. The length of the multiple-time cable of the DC welding machine is not allowed to exceed 5m, and the distance between the three bottles and the fire is not allowed to be less than 10 meters.
15. At the end of work, water spraying is used at the address during work, and full-time personnel are stranded for about half an hour to monitor for abnormalities.

This article links: http://yuedongzs.cn/gs/381.html

Sales service department: Manager Wang: 13210682555 Sales department one: 0536-4857999 Sales department two: 0536-6256789
After-sales service department: Manager Wang: 15863543333 Technical service department: Manager Liu: 15963636555
Service supervision hotline: Manager Shen: 13465665999 Fax: 0536-6685555 E-MAIL: sdwxhb999@163.com
Address: The west side of the south of Wenshui South Road, Xin'an Street, Anqiu City, Weifang City, Shandong Province. Record number: Lu ICP No. 17019770
Copyright © 2015-2021 yuedongzs.cn, Ali's official website: wanxinghuanbao.1688.com